Butterhill Wells Dehumidification System

New Windsor, NY

Project Details

Client: Town of New Windsor

As part of a 6.4 MGD (million gallons per day) groundwater supply project in the Town of New Windsor, a new water treatment facility was designed and constructed.  The Heating, ventilation, and air conditioning design for the water treatment facility included a two zone ducted dehumidification system, designed to control the humidity within the building. Separate dehumidifier units with exterior condensers were provided for each floor of the water treatment building.  Individualized controls and automation allowed for humidity setpoints at each level of the water plant.  Alarms were provided if humidity levels within the building exceed the set point thresholds.

Highlighted Services

Sorry, we couldn't find any services in this category.